DHTML Menu JavaScript Menu Powered by Milonic
 
 

   Chair Professor

  Chung-Yee LEE (§õ©¾¸q)
  (PhD, Yale University, 1984 )

  ROOM: 5539
  TEL: 2358-7110
  E-MAIL: cylee@ust.hk
  Home URL: http://www.ielm.ust.hk/dfaculty/cylee/




Research Interests:
Logistics and Supply Chain Management, Production Scheduling


Profile:
Dr. Chung-Yee Lee is Head and Chair Professor of the Industrial Engineering and Logistics Management Department at the Hong Kong University of Science & Technology (HKUST). He is also the Founding and Current Director of Logistics and Supply Chain Management Institute at HKUST. He is a Fellow of the Institute of Industrial Engineers in U.S. and also a Fellow of Hong Kong Academy of Engineering Science. Before joining HKUST in 2001, he was Rockwell Chair Professor in the Department of Industrial Engineering at Texas A&M University. He worked as a plant manager and also had few years consulting experience in Taiwan. In the past 22 years he has engaged in numerous research projects sponsored by NSF, RGC, ITF, IBM, Motorola, AT&T Paradyne, Harris Semiconductor, Northern Telecom, Martin Marietta, Hactl, and Philips Medical. He has published more than 100 papers in refereed journals. He served as the Editor for IIE Transactions on Scheduling and Logistics for four years. Currently he serves in the editorial board of several journals, including for example, Operations Research, Journal of Scheduling, IIE Transactions, Naval Research Logistics, and Production and Operations Management. He received his Bachelor degree in Electronic Engineering (1972) and a Master degree in Management Sciences (MBA Program) (1976) from National Chiao-Tung University in Taiwan. He also received a Master degree in Industrial Engineering from Northwestern University in 1980 and his Ph.D. degree in Operations Research from Yale University in 1984.


Publications:
(1) Chen, F., and C.-Y. Lee, ¡§Minimizing the Makespan in a Two-Machine Cross-Docking Flow Shop Problem,¡¨ European Journal of Operational Research, accepted for publication.

(2) Fu, K., V. Hsu, and C.-Y. Lee, ¡§Optimal Component Acquisition for an Assemble-to-Order System with Expediting,¡¨ Manufacturing & Service Operations Management, accepted for publication

(3) Jaruphongsa, W., S. Cetinkaya and C.-Y. Lee, ¡§Outbound Shipment Mode Considerations for Integrated Inventory and Delivery Lot-Sizing Decisions," Operations Research Letters, accepted for publication

(4) Chen, B., and C.-Y. Lee, ¡§Logistics Scheduling with Batching and Transportation,¡¨ European Journal of Operational Research, accepted for publication.

(5) Cetinkaya, S., E. Tekin and C.-Y. Lee, ¡§A Stochastic Model for Joint Inventory Replenishment and Outbound Shipment Release Decisions,¡¨ IIE Transactions, accepted for publication.

(6) Jaruphongsa, W., and C.-Y. Lee, Dynamic Lot-Sizing Problem with Demand Time Windows and Container-Based Transportation Cost,¡¨ Optimization Letters, 2, (2008), pp. 27-37.

(7) Lee, C.-Y., and G. Yu, ¡§Parallel-Machine Scheduling under Potential Disruption,¡¨ Optimization Letters, 2, (2008), pp. 27-37.

(8) Hsu, V., C.-Y. Lee and R. C. So, ¡§Managing Components for Assemble-To-Order Products with Leadtime-Dependent Pricing: The Full-Shipment Model,¡¨ Naval Research Logistics, 54, (2007), pp. 510-523.

(9) Lee, C.-Y., and G. Yu, ¡§Single Machine Scheduling under Potential Disruption,¡¨ Operations Research Letters, 35, (2007), pp. 541-548.

(10) Fu, K., V. Hsu, and C.-Y. Lee, ¡§Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity,¡¨ Operations Research, 54, (2006), pp. 1137-1150.

(11) Gribkovskaia, I. A, C.-Y. Lee, V. A. Strusevich and W. de. Werra, ¡§Three is Easy, Two is Hard: Open Shop Sum-Batch Scheduling Problem Refined,¡¨ Operations Research Letters, 34, (2006), pp. 459-464.

(12) Hsu, V., C.-Y. Lee and K. C. So, ¡§Optimal Component Stocking Policy for Assemble-To-Order Systems with Lead-time-Dependent Component and Product Pricing,¡¨ Management Science, 52, (2006), pp.337-351.

(13) Cetinkaya, S., F. Mutlu and C.-Y. Lee, ¡§A Comparison of Outbound Dispatch Policies for Vendor-Managed Inventory Systems,¡¨ European Journal of Operational Research, 171, (2006), pp. 1094-1112.

(14) Lee, C.-Y., J. Leung and G. Yu, ¡§Two Machine Scheduling under Disruptions with Transportation Considerations¡¨ Journal of Scheduling, 9, (2006), pp. 35-48.

(15) Wang, H., and C.-Y. Lee, ¡§Production and Transport Logistics Scheduling with Two Transport Mode Choices¡¨ Naval Research Logistics, 52, (2005), pp.796-809.

(16) Lee, C.-Y., and V.A. Strusevich, ¡§Two-Machine Shop Scheduling with an Uncapacitated Interstage Transporter,¡¨ IIE Transactions, 37, (2005), pp. 725-736.

(17) Jaruphongsa, W., S. Cetinkaya and C.-Y. Lee, ¡§A Dynamic Lot-Sizing Model with Multi-Mode Replenishments: Polynomial Algorithms for Special Cased with Dual and Multiple Modes¡¨ IIE Transactions, 37, (2005), pp.453-467.

(18) Li, C.-L., G. Vairaktarakis, and C.-Y. Lee, ¡§Machine Scheduling with Deliveries to Two Customer Locations,¡¨ European Journal of Operational Research, 164, (2005), pp. 39-51.

(19) Jaruphongsa, W., S. Cetinkaya and C.-Y. Lee, ¡§A Two-Echelon Inventory Lot-Sizing Problem with Demand Time Windows,¡¨ Journal of Global Optimization, 30, (2004), pp. 347-366.

(20) Jaruphongsa, W., S. Cetinkaya and C.-Y. Lee, ¡§Warehouse Space Capacity and Delivery Time Window Considerations in Dynamic Lot-Sizing for a Simple Supply Chain,¡¨ International Journal of Production Economics, 92, (2004), pp. 169-180.

(21) Lee, C.-Y., ¡§Inventory Replenishment Model: Lot Sizing versus Just-in-Time Delivery,¡¨ Operations Research Letters, 32, (2004), pp. 581-590.

(22) Chang, Y.-C. and C.-Y. Lee, ¡§Machine Scheduling with Job Delivery Coordination,¡¨ European Journal of Operational Research, 158, Issue 2, (2004), pp. 470-487.

(23) Vairaktarakis, G, and C.-Y. Lee, ¡§Analysis of Algorithms for Two-Stage Flowshops with Multiprocessor Task Flexibility,¡¨ Naval Research Logistics, 50, (2003), pp. 44-59

(24) Chang, Y.-C. and C.-Y. Lee, ¡§Logistics Scheduling: Analysis of Two-Stage Problems¡¨ Journal of Systems Science and Systems Engineering, 12, (2003), pp. 385-407.

(25) Toptal A., S. Cetinkaya and C.-Y. Lee, ¡§The Buyer-Vendor Coordination Problem: Modeling Inbound and Outbound Cargo Capacity and Costs,¡¨ IIE Transactions, 35, (2003), pp. 987-1002.

(26) Lee, C.-Y., S. Cetinkaya and W. Jaruphongsa, ¡§A Dynamic Model for Inventory Lot-Sizing and Outbound Shipment Consolidation at a Third Party Warehouse¡¨ Operations Research, 51, (2003), pp. 735-747.

(27) Lee, C.Y., S. Tan, and H. Yan, ¡§Designing Assembly Process with Stochastic Material Arrivals,¡¨ IIE Transactions, 35, (2003), pp. 803-815.

(28) Chen, Z. L., and C.-Y. Lee, ¡§Scheduling of Depalletizing and Truck Loading,¡¨ Naval Research Logistics, 50 (2003), pp. 239-256.

(29) Hsu, V. N., R. de Matta, and C.-Y. Lee, ¡§Scheduling Patients in an Ambulatory Surgical Center,¡¨ Naval Research Logistics, 50 (2003), pp. 218-238.

(30) Cetinkaya, S., and C.-Y. Lee, ¡§Optimal Outbound Dispatch Policies: Modeling Inventory and Cargo Capacity,¡¨ Naval Research Logistics, 49, (2002), pp. 531-556.

(31) Chen, Z.-L. and C.-Y. Lee, ¡§A Column Generation Algorithm for Parallel Machine Common Due Window Scheduling,¡¨ European Journal of Operational Research, 136, (2002), pp. 512-527.

(32) Vairaktarakis, G, X.Q. Cai, and C.-Y. Lee, ¡§Workforce Planning in Synchronous Production Systems,¡¨ European Journal of Operational Research, 136, (2002), PP. 551-572.

(33) Lee, C.-Y., and L. Lei, ¡§Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases,¡¨ Annals of Operations Research, 102, (2001), pp287-307.

(34) Lee, C.-Y., and C.-S. Lin, ¡§Single-Machine Scheduling with Maintenance and Repair Rate-Modifying Activities,,¡¨ European Journal of Operational Research, 135, (2001), pp. 491-513.

(35) Lee. C.-Y., S. Cetinkaya, and A. P. M., Wagelmans ¡§A Dynamic Lot Size Model with Demand Time Windows,¡¨ Management Science, 47, (2001), pp.1384-1495.

(36) Zhang, G., X. Cai, C.-Y. Lee, and C.K. Wong, ¡§Minimizing makespan on a single batch processing machine with nonidentical job sizes¡¨ Naval Research Logistics, 48, (2001), pp. 226-240.

(37) Lee, C.-Y., and J. Leon, ¡§Machine Scheduling with A Rate-Modifying Activity,¡¨ European Journal of Operational Research, 128, (2001), pp. 119-128.

(38) Lee, C.-Y., and Z. L. Chen, ¡§Machine Scheduling with Transportation Considerations,¡¨ Journal of Scheduling, 4, (2001), pp. 3-24.


Involved Projects:
Active Projects:

Hong Kong International Terminal, ¡§In-Bound Logistics Scheduling,¡¨ Analysis on an Automatic Stacking Crane System,¡¨ Jan. 2007 ¡V June 2007, Amount HK$ 400,000.

NSFC/RGC Joint Research Scheme, ¡§In-Bound Logistics Scheduling,¡¨ (N-HKUST612/06), Jan. 2007 ¡V December 2009, Amount HK$ 730,700.

Research Grants Council of Hong Kong, (615607), ¡§Procurement Risk management using options,¡¨ Sept. 2007 ¡V Aug. 2009, HK$382,800.